Project D

A complete data center infrastructure project covering the design and installation of a security cage, server racks, and cold aisle containment. From redesigning the enclosure to overcome site obstacles to delivering and installing the final system, the project reflects a practical approach to security, organization, and airflow control within a live facility.

Construction

6 Weeks

Scope:
  • Design of containment and caging
  • Structural planning
  • Design of Security Cage
  • Environment adaptation

Learn More Project D

Project C

CAC system designed with a focus on structural integrity to ensure long-term reliability and stability. Consideration of the customer’s requirement for the flexibility to relocate racks freely.

Construction

4 Weeks

Scope:
  • Supply and Installation of racks and PDU
  • Structural Analysis
  • Design of Free Hanging Cold Aisle Containment

Learn More Project C

Project B

The design of CAC tailored to the specific requirements of the data center. Optimizing the airflow and ensuring efficient cooling for densely packed racks.

Construction:

4 Weeks

Scope:
  • Supply and Installation of racks and PDU
  • CFD case study
  • Design of Cold Aisle Containment

Learn More Project B

Project A

Large-scale supply and installation of server racks and PDUs to support enhanced data center operations.

Construction Time

3 Weeks

Scope
  • Supply and Installation of racks and PDU

Learn More Project A

Close Search Window